Credible programmes. Early warning.

Project planning, scheduling and project controls for mining, construction and engineering.

Discuss your project Free schedule health check

Mining

Pits, plant and associated mining works

Construction

From mobilisation to completion

Engineering

Multidisciplinary and infrastructure programmes

Global

On site or remote, wherever the project is

About PlannerLink

PlannerLink helps construction, mining and engineering teams set credible plans, keep visibility and act early when performance changes.

Who we help

  • Owners
  • Contractors
  • Engineering teams

One assignment or ongoing, without another full-time hire.

What we do

  1. BaselineCredible programmes
  2. UpdateProgress and reviews
  3. AnalyseCritical path, float, recovery
  4. ReportWeekly, monthly, dashboards
  5. TrainPrimavera P6
Sample programme
ActivityDaysAfter
Mobilise & establish site5Start
Clear & grub8Mobilise
Bulk earthworks15Clear & grub
Drainage culverts6Clear & grub
Crusher pad concrete10Bulk earthworks
Haul road pavement9Earthworks, drainage
Commission & hand over4Concrete, pavement

What a slip costs

Pick an activity and slip it. The programme reschedules through its logic links: float soaks up some delays, and the critical path passes every day straight to completion.

Activity

Completion Tue 15 Dec

Completion holds

Drainage culverts has 10 days of float before it touches completion.

Now check yours

Free schedule health check: send us your P6 programme and we’ll show you, in plain language, where its logic, constraints and float put completion at risk.

Check my schedule
Schedule health summarySample report · 1,284 activities
Sample schedule health check results
CheckResultTargetStatus
Missing logic2.1%≤ 5%Pass
Leads (negative lags)00Pass
Lags9.0%≤ 5%Review
Finish-to-start links93%≥ 90%Pass
Hard constraints7.4%≤ 5%Review
High float (over 44 days)18.2%≤ 5%Review
Negative float00Pass
High duration (over 44 days)3.1%≤ 5%Pass
Critical path testPassedPassPass

Fix first: 95 hard constraints override the logic, 6 of them on the critical path.

Four services,one method

Planning, Primavera P6, reporting and software, all aimed at one thing: a programme the project can trust.

Each service stands alone or works together with the others. Support can be a single assignment or ongoing.

All services

How we engage

Start small and grow only if it helps. Most clients begin with a health check or a single assignment, then keep a planner on call.

  1. Free schedule health check

    Send us a P6 export and get a short written review of logic, constraints, float and the critical path.

    Free, no obligation

  2. Defined assignment

    A baseline programme, an independent review, a recovery programme or a report pack, delivered to an agreed scope.

    Fixed scope, quoted up front

  3. Ongoing remote planning

    A planner on your team without another full-time hire: weekly updates, progress data and reporting.

    Monthly, sized to the project

  4. Training

    Primavera P6 training for individuals or teams, built around your project standards, remote or on site.

    Per course or per team

Built in the field

Detailed scheduling backed by a clear understanding of how projects are actually delivered, on mines, construction sites and infrastructure around the world.

Loaded haul truck on a mine road, seen from above

Our work rests on four principles: reliable data, clear communication, practical solutions and information project teams can actually use.

Sectors
Mining, construction, engineering
Software
Primavera P6, Excel, Power BI
Delivery
On site or remote
Engagement
Assignment or ongoing

Talk about your project

Tell us about the project, the challenge, where it is and when you need support. We'll come back with the most practical next step.

Your message goes straight to PlannerLink. We reply by email or phone, whichever you prefer.

Direct lines